Dogs
Cats
Small Animals
Birds
Fish

Hem & Boo Non Slip Double Handle Long Lead

  • Hem & Boo Non-Slip Double Handle Long Lead (1.8m x 15mm) - Built for control, comfort, and adventure, whatever the weather.

    The Hem & Boo Non-Slip Double Handle Long Lead is the ideal choice for dog owners who want both freedom and control during walks. Crafted from durable, tightly woven nylon with interwoven rubber for added grip, this lead delivers strength and comfort in every step. The double handle design offers extra control when needed, making it perfect for busy areas or training.

    Whether you're navigating crowded paths or giving your dog room to explore, this lead provides the best of both worlds, secure handling and freedom to roam.

    Key Features

    • Double Handle: For enhanced control in high-traffic or training situations
    • Durable Materials: Strong nylon construction built to last
    • Non-Slip Grip: Interwoven rubber for a firm, weather-resistant hold
    • Long Length (1.8m): Offers more freedom for your dog to explore
    • Comfortable & Practical: Designed for both everyday walks and active outings

    Give your dog the space to explore while keeping them safe and secure with the Hem & Boo Non-Slip Double Handle Long Lead, the perfect lead for active lifestyles.